Report from EGB Horse Ride Ringstead 17/18 June 2017

Thank you to all the team that were available to assist with communications at this two day event.

It turned out to be the hottest weekend of the year so far with temperatures peaking in the PM at  over 30C in places.

Thankfully incidents were limited and mainly related to heat or riders getting misplaced.

RF wise we ran the usual frequency of 144.650MHZ using 5W and locally provided cover to all but one of the locations directly. We struggled at times on Saturday with another event taking place on the eastern side of Norfolk that were using the same frequency. There appeared to be one station that was either running sub-tones or had a very deaf receiver – as although they were a good  signal they did not hear our replies from the control location even after increasing our power levels briefly to 50W.

HF was attempted on Sunday but unfortunately either due to RF noise or location proved unusable.

Share

Report from Samaritans Charity Cycle Ride 14 May 2017

Thanks to the members that were able to support this event.  We had a good turnout of riders considering the preceding weather (heavy rain).

We used the Red Barn watering point as the RF control for this event as this location could hear all the outstations -the event control at start always has difficulty into the hollows at Fring and Sedgeford. This worked well and critical messages were relayed as needed.

St John Ambulance had a couple of minor issues to deal with but overall no great problems.

Event Control – doing what we do best – setting up in the middle of a field!

Event Control

Share

Report from Sandringham Charity Horse ride Sun 07 May 2017

Thank you to the members that were able to assist at this event. Even though the weather was somewhat cool in a brisk Northerly breeze around 250 riders took part over this popular multi-distance pleasure horse ride.

We had a revised course which was covered well from the control location in the middle of the route. We also had to amend control arrangements due to the setting up of a caravan rally in the adjoining field which added some challenges and the use of a compact antenna arrangement.

Share

Report from Houghton Charity Horse Ride 23rd April 2017

Thank you to all the members that were able to assist at this event.  We ran a good net on 2m with coverage easily on 5W from the control location.

Just over 200 riders took part on a cool but at times sunny day.  A couple of riders decided to come off their horses but thankfully no major injuries.

Control station at the ride

Share